Pelagos Data Centres
UPP · Gibraltar
Projects / Built project
A Leeds and Liverpool clinic fit-out uses curved walls and a bold red finish to keep healthcare spaces welcoming.
The story
Impress Clinics was completed in September 2022 across Leeds and Liverpool city centres; UPP's page explains that the Leeds clinic was developed with Raul Sanchez Architects.
UPP worked from RIBA Stages 4 to 6, delivering technical design and construction oversight for curved walls, a red finish and a non-clinical interior.
Credits
The practice