Projects / Project

London Fire Brigade Headquarters

8 Albert Embankment, London, United Kingdom

Preconstruction and design-development work for the future refurbishment of London Fire Brigade's Grade II listed former headquarters.

Client
London Fire Brigade
Current role
Preconstruction and Stage 3 or 4 design development
Heritage
Grade II listed headquarters opened in 1937
Expected construction
From mid-2027

The story

The story behind the work.

London Fire Brigade plans to bring its 1937 headquarters at 8 Albert Embankment back into use. Willmott Dixon Interiors is appointed for preconstruction services and to finalise Stage 3 and 4 design for the Grade II listed building's refurbishment.

The proposed scope renews mechanical, electrical, public-health and life-safety systems, windows, roofs and the cladding of the later control-room extension. Internal work would add lifts, partitions, ceilings, joinery and finishes, refurbish appliance bays and create a public events and exhibition space.

The official case study says construction is expected to begin in mid-2027 and anticipates space for about 840 staff. It is therefore presented as planned fit-out and refurbishment work, not as a completed project. Empty numerical placeholders on the source page are deliberately excluded.

Credits

Preconstruction and refurbishment design development
Willmott Dixon Interiors

The practice

Willmott Dixon Interiors

View practice

Related conversation

Selected Willmott Dixon Interiors fit-out case studies to explore alongside Enrique Soler's conversation about moving from architecture into contractor-led interior design.

Listen to episode

Keep exploring

More by this practice.